04/11/2021

  • Period: to

    Before half term.

    We did conversion of hexadecimal into binary
  • Period: to

    04/11/2021

    Today we carried out a lab exercise based around the configuration of a network which in itself required the configuration of specific elements that would help with the network such as setting up the DNS server. We then created a document presenting our results from this exercise and attached an explanation of what we did in each step and what each element's purpose is.