-
4:40 P.M.
the cutters had finished their work. With five minutes to go, they stood around, talking until the quitting bell rang. -
5:00 P.M.
The windows busted and there was more air that got exposed to the fire. -
4:45 P.M.
Workers from the other firms had already left; triangle employees had to stay longer to fill back orders. -
4:45 P.M.
Someone pulled the eighth-floor fire alarm -
5:15 P.M.
thirty five minutes after flames bursts from beneath the cutting table, firefighters had brought the blaze under control. -
4:42 P.M.
All of the sudden, the fire started and everyone was pancaking. -
4:47 P.M.
The firefighters had arrived at the fire in the triangle factory. -
4:50 P.M.
people escaped the building through the elevator. -
4:50 P.M.
Heat and Pressure blew out the eight floor. -
8:00 A.M.
The chief came to the building and saved a mouse