-
Period: to
finish the POC design
to finish the POC design I need 4 hours. I'll start this 26-01-2021, 12:00, and completed this on: 27-01-2021. -
Period: to
Code the POC
Code the POC, (2h) -
Period: to
upload the code and run it
0.5h -
Period: to
Get Results and register them
Results we need 2h to get and register them -
Period: to
consolidate results this and write a report
1h to consolidate this and write a report