-
Workshop Day 1
-
Period: to
Between the Lines
-
Period: to
A Grand Day for It
-
Workshop Day 2
-
Submit Story Outline / Synopsis
-
Props and Costume Design Begins
Locate Costumes, Props etc. Design additional Costumes and Props, Order Materials -
Locations Search Begins
Look for suitable locations for scenes to take place, take photographs and share on facebook. -
General Sound Design Begins
Collect General Sounds for each location and scene. Weather, Animals viehcles etc -
Script Submission 1st Draft
-
Story Boards with Location Photo and Script (2nd Draft)
-
Final Draft Scripts
-
Final Costume and Prop Design
-
Build Set
-
Period: to
Easter Holidays
-
Shoot Day 1
-
Shoot Day 2
-
Editing & Post Production