Filming Schedule

  • PITCH

    PITCH
    Pitch main ideas and branding to class. The feedback we received was positive and were additionally given stronger ideas on binary oppositions of black and white.
  • Filming: Starbucks

    Filming: Starbucks
    Unfortunately there had been confusion between us and the management when we had asked if we could use their space to film on this day. This is necause one we had made it to the location we were turned down and asked to contact their press office, which we have done, and in the end we not given permission to film. This wasn't a big issue as we are flexible as a group and merely thought of a new location.
  • Test Shots

    Test Shots
    One of the group members had taken test shots starting in Waterloo Station, Southbank up until Southwark Station. More than half of the found locations had been used so far, however if there is anything we would need to change we still have a few locations listed.
  • Filming: Regents Park

    Filming: Regents Park
    Filming in Regents Park had been successful and we obtained moe footage than needed. The sun was also out which is what we were hoping to get.
  • Filming: Waterloo

    Filming: Waterloo
    Due to the weather conditions we had lost some time filming as it was raining and very windy. The umbrella hadn't helped as we were filming near the River Thames. Nevertheless we managed to get the footage we needed and several basetracks that should be more than enough. (We hope so anyway)
  • Equipment Handed in

  • First Editing Session

    Back from filming and half term, ready to edit!
  • Editing

    Editing
    First rough cut edit. Although from feedback another rough cut will be made in the classic base track style editing instead of adding on footage, next lesson.
  • Rough Cut Deadline

    Rough Cut Deadline