-
Period: to
CAD 2nd Quarter up to break
Mr. Sommer's PageMr. Niinisto's PageAssignments up to Winter Break! -
MONDAY! TURN IN MEASUREMENT HOMEWORK
See Mr. Sommer - Review events on timeline, and discuss procedure for dimensioning. -
Cover Plate and Metal Gasket Due
Turn in Metal Bracket if it is also done. Work on hand lettering at home if not yet completed. -
A-12M/3 GUIDE BLOCK
Check with Mr. Sommer for next weeks assignment -
HOUSE STYLE PROJECT DUE
-
AUTOCAD 7271 SPECIAL KEY DUE
-
KITCHEN MEASUREMENTS
WORK ON OVER THANKSGIVING BREAK -
IT FOR GIRLS
COMPLETE SIMPLE KEY AND TEACH WITH STYLE -
DRAWINGS DUE
KITCHEN SKETCHES, CABINET ELEVATIONS, KITCHEN CAD DRAWING, 1269-1,1269-2,1269-3,1269-4, -
START DRAWINGS
7301,7302,7303,7304 -
CAD EXAM
EXAM DAY -
NO SCHOOL
NO SCHOOL -
DRAWINGS DUE
7301,7302,7303,7304 -
MODELS DUE
MODELS DUE -
DRAWINGS 652 1-3 DUE
SKETCHES AND CAD DRAWINGS ARE DUE -
IX FIELD TRIP
GARDEN AND HOUSING -
Drawings 6.55, 6.56, 6.57. due
see page 184, ask Mr. Niinisto if unsure., FINISHING 6.55 -
7-32,33,34 DUE
DUE DATE -
FIND ITEM AT HOME to bring in tomorrow, FRIDAY!!!
Item must have at least 3 parts (like the tape dispenser Mr. Sommer showed). Pick something simple to draw. If it has too many small part it will be difficult to measure. The tape dispenser was probably a good type of item. -
Give Mr. N item from home! COMPLETE MANUAL DRAWINGS
BE CLEAR ON ASSIGNMENT FOR NEXT WEEK, give Mr. N item from home for approval. -
REVERSE ENGINEERING DRAWING DUE FRIDAY
TURN IN DRAWING ON FRIDAY -
TURN IN CERTIPORT FORM
GET CERTIPORT FORM SIGNED AND TURNED IN -
SOLIDWORKS
WORK ON ASSIGNED DRAWINGS -
CONTINUE ON GEARBOX IN SOLIDWORKS FOR REMAINDER OF THIS QUARTER
-
TURN IN SKETCH AND PROGRESS REPORT
-
WORK ON POSTER
-
IN CLASS ASSIGNMENT WITH SUB
-
FINISH POSTER
-
PICK UP ON AUTOCAD WHERE CLASS IS AT
-
PRINT OUT POSTER
-
START 11.2.9 SCREW THREADS
SQUARE HEAD FASTENER, ACME HEAD FASTENER -
SEE MR. NIINISTO FOR ASSIGNMENTS AND DEADLINES
IF NOT COMPLETE GET CONFIRMATION BEFORE SWITCHING ASSIGNMENTS