  signed on 3-14-2011
- 
  
  
- 
  
  
- 
  
  
- 
  
  
- 
  
  Here is how the lot looks before it was cleared.
- 
  
  
- 
  
  
- 
  
  Today the footing forms were built. This will be the footing that the retaining wall will sit on.
- 
  
  
- 
  
  
- 
  
  
- 
  
  
- 
  
  
- 
  
  
- 
  
  Rear view of house during framing
- 
  
  Front view of the house during framing of basement
- 
  
  
- 
  
  
- 
  
  
- 
  
  
- 
  
  
- 
  
  Adding borads to roof and framing the 3rd level
- 
  
  
- 
  
  
- 
  
  
- 
  
  
- 
  
  
- 
  
  
- 
  
  
- 
  
  The entire area over the living room was to be vaulted. In the picture shows only 1/2 the area was vaulted. There was a misunderstanding and the engineer is going to redo the rafters (in the red area) to match the vaulted angle,
- 
  
  
- 
  
  
- 
  
  
- 
  
  
- 
  
  
- 
  
  The workers added the covered roof over the middle portion of the deck.
- 
  
  
- 
  
  
- 
  
  A “4-Way” inspection is where the Framing, Plumbing, Electrical, Heating reviewed. There were a few items found with the framing that needed to be corrected,
- 
  
  The house passed this inspection. Now the installation of insulation can be started.
- 
  
  
- 
  
  