Photo Update - Excavation
<a href='https://www.facebook.com/media/set/?set=a.127193410789404.24854.126246854217393&type=1' target="_blank" >Photo Album</a> With all excavation complete within the next few weeks. Trident Grand Riverside will soon start to take form. -
Construction Video Update - Excavation
<a href='http://www.youtube.com/watch?v=ZVpWhkgb_Kw' target="_blank" >Video</a> With the excavation drawing to a close (at a depth of 9m) the survey team are now setting out the footing and checking the levels. -
Sales to Commence End of 2013
<a href='https://www.facebook.com/photo.php?fbid=145150392327039&set=a.133914226783989.26725.126246854217393&type=1&theater' target="_blank">Facebook Post</a> Trident Grand Riverside - Latest News!
Sales will be commencing at the end of 2013 and will be exclusively sold by Pam Golding Properties - Kenya -
Construction Video Update - Heavey Rains
<a href='http://youtu.be/vFWAHfRiCXQ' target="_blank">Video</a> After some heavy rain over the past few weeks, the team have been pumping all the water out of the newly formed column bases, while the excavators clear away all the excavated materials -
Latest Construction Pics
<a href='https://www.facebook.com/media/set/?set=a.158572800984798.1073741825.126246854217393&type=1' target="_blank">Photo Album</a> The construction team our now preparing the framework for the basement columns. And as the rains still coming down, pumping the water out of the site is still ongoing. -
Construction Video Update - Column Bases
<a href='http://www.youtube.com/watch?v=lz058cA5UKk' target="_blank">Video</a> With a lot of activity on the site now the team moves forward with the trimming and blinding of the column bases. -
Trident Grand Riverside - Photo Update 05-06-2013
Facebook Photo Album Latest update from Riverside Grand.
The crane erection has begun, on going on the site, the crew are busy doing the steel reinforcement as well as casting of the column bases. -
Trident Grand Riverside - Construction Update 04/06/13
Video Update Ready mix cement arrives on site to cast the column bases.
Sales to commence end of 2013 and will be exclusively sold by Pam Golding Properties - Kenya -
Trident Grand Riverside - Construction Update 08/07/13
Photo Album The form work to basement 2 floor slabs is currently on going as well as column bases reinforcements. The cutting and bending of steel of site and shuttering to the retaining wall. -
-
Trident Grand Riverside Latest Construction Updates- 9/09/2013
Photo Album Steel fixing and form work for basement 02 slab in progress -
Trident Grand Riverside:- Our men in Yellow
Photo Trident Grand Riverside:- Our men in Yellow.. carefully doing form work for the beams along the grid. -
Trident Grand Riverside Progress Update
Photo- Skin wall for basement 1 in progress.
- Column reinforcement and form work for Basement 1 in progress
-
Trident Grand Riverside has been awarded with the African Property Awards
Photo Trident Grand Riverside has been awarded with the African Property Awards-Development; Highly Commended for: Development Multiple Units Kenya 2013-2014.
Congratulations are in order to the Trident Estates Team! -
Trident Grand Riverside: Construction Update 07/11/2013
Video Activity on site has increased with form-work being done on the lift shaft and the beams on the ground floor level.
And other teams working on clearing the rubble on the basement 1. -
-
Trident Grand Riverside - Construction Update 22/11/2013
Photos Cement casting for Ground Floor level www.tridentestates.co.ke -
Trident Grand Riverside Award
Award Trident Grand Riverside Award adjacent to the Trident Grand Riverside Image -
Trident Grand Riverside - Construction Update 04/02/2014
Video Update Advancements have been made in casting the ground floor. and work has begun on the 1st floor framework and column reinforcement. In addition, the crane was erected in the 2nd week of January. -
Officially launching on Friday 7th March 2014.
Post Pam Golding Properties - Kenya
Looking for luxury living? Trident Grand Riverside sales are officially launching on Friday 7th March 2014. For more info kindly contact: Shafana +254 (0) 736 774101 Natasha +254 (0) 739 605636 -
Trident Grand Riverside - Luxurious Living in Riverside Animation
Video Animation Trident Grand Riverside is an oasis of 3, 4, & 5 bedroom state-of -the-art luxury apartments in twin towers set on the exclusive, eco-friendly Riverside Drive. Ornate decor and prime craftsmanship magnificently enhance the elegant, spacious quarters; an embodiment of style and functionality. Savor the sophistication of the avant-garde open plan Snaidero kitchen as you appreciate the attention to detail t -
-
Construction Update
Photos Trident Grand Riverside: Casting of columns for first floor completed in March -
-
Trident Grand Riverside Progress Update:
Photo Update Form work for the lift shaft on the third floor -
Trident Grand Riverside - 02 May 2014 Update
Video Update Completion of casting the second floor slab and columns for the third floor. And completion of third floor framework. -
Trident Grand Riverside Kitchens
Photo Update Snaidero Kitchens will be fitted in each house and include extraordinary designs, made-to-measure and made using eco-sustainable materials and processes.
The result of advanced technologies combined with craftsmanship in every single detail. These kitchens are able to adapt to any space and stand the test of time -
-
Trident Grand Riverside: Progress Update
Photo Album Slab casting and concreting for the fourth floor slab is now 90% complete. Steel fixing for 5th floor columns ongoing. -
Trident Grand Riverside - Progress Update
View Photo
Waterproofing of the basement retaining wall in progress for Phase 2. -
Trident Grand Riverside - Progress Update as of 4th July 2014
View Photos Paint works and Gypsum ceiling installation for the show house in progress. -
Trident Grand Riverside - Progress Update as of 5th July 2014
View Photos
View of Tower 1 from the ground.