-
PROJECT HANGUL
Project characteristics analysis
Planned : The project was planned by the government of India with clear objectives and well planned measures to achieve them as well.
Unique : The project was done with its own unique features and identity
Temporary : The project was temporary in nature started in 1970 and ended in 1980
Define deliverable : To ensure its increase in number and existence of Hangul
Link: Neostencil. (n.d.). Retrieved from hangul#:~:text=Project%20Hangul%2D%20Conservation%20of%20K -
PROJECT TIGER
i. Planned: The Project Tiger is a well-planned one as it has proper objectives planned and proper steps to achieve these objectives.
ii. Unique: It is first kind of project introduced by the Indian government for the protection of Tigers.
iii. Temporary: It is introduced in 1973.
iv. Define Deliverable: Increase in tiger population.
https://en.wikipedia.org/wiki/Project_Tiger#/media/File:National_Tiger_Conservation_Authority_logo.png -
Crocodile Conservation Project
Project characteristic analysis
Planned: Government had proper plans and actions for save the endangered species from death.
Temporary: This project was temporary and it introduced in August 1975
Unique: This project was unique because it was the first project by the Odisha government for save crocodiles.
Define Deliverable: After the successful implementation in Odisha the number of crocodiles increase three times more.
link:https:https://www.conservationevidence.com/individual-study/1487 -
Project Snow Leopard
Project characteristic analysis: Planned: The Snow Leopard Project is such a well-planned one as it has planned proper goals and proper steps to attain those goals.
Temporary: This project launched in January 2009 Unique: This was the first project by Indian government to conserve snow leopards. Define Deliverable: Through this project India increase their snow leopards population.
link: https://www.britannica.com/animal/snow-leopard -
Conservation Project for Rehabilitation of Koala.
i Planned: Since The Conservation project of Koala has proper objectives and methods to achieve the aim, the project is planned
ii. Unique: The project is introduced by the government of New South Wales for the conservation and rehabilitation of koalas.
iii. Temporary: It is introduced in 2012
iv. Define Deliverable: To create a natural living space for Kolas and thereby increase the population of Koala in the following 100 years.
https://www.savethekoala.com/shop/products/sticker-akf-logo -
SAVING GANGES RIVER DOLPHINS PROJECT
Project characteristics analysis
Planning : The project was planned by co-operational efforts of India and Nepal.
Unique : This project was unique in its nature because of its bi- national trans-boundary conservation plan
Temporary : Its duration was from 2015 – 2016 (ICUN, n.d.)
Deliverable : To protect and ensure the survival of endangered Ganges River Dolphins
Link: IUCN. (2020). Retrieved from https://www.iucn.org/asia/countries/nepal/saving-ganges-river-dolphin