275px image of triangle shirtwaist factory fire on march 25   1911

The Triangle Factory Fire Timeline

  • Period: to

    4:40

    The cutters had finished their work, with 5 minutes they stood and socialized until the quitting bell rang, although it was against the rules the workers had lit some cigarettes
  • Period: to

    4:45

    someone has pulled the eighth floor fire alarm, in less than 2 minutes the horse drawn vehicles of engine company, 72 arrived
  • Period: to

    4:47

    Workers on the eighth floor ran furiously for two passenger elevators
  • Period: to

    5:15

    After exactly 35 minutes after flames burst from beneath a cutting table, firefighters had brought the blaze under control. An hour later Chief Croker made his inspection he found that then Asch Building had no damage