-
Began with the laying of the cornerstone
-
Built only the walls and fitted the roof trusses
-
The British burned the building, leaving only an empty shelf
-
To cover up the traces of fire, ordered a thie paint on teh gravel, started to be called " White House'' officially.
-
The spring water into the White House, end of the White House to pull out the history of water
-
The central heating equipment was installed and built second floor bathroom and toilet
-
Established the library
-
First elevator used in the White House
-
Western wing was expanded to build the famous Oval Office
-
Rose garden for the first time to grow roses
-
Construction of the third floor
-
The west wing was renewed again
-
Added a balcony at the southern colonnade
-
Installed a fire alarm system
-
Cancel the implementation visitors could take pictures