  • Began with the laying of the cornerstone

    Began with the laying of the cornerstone
  • Built only the walls and fitted the roof trusses

    Built only the walls and fitted the roof trusses
  • The British burned the building, leaving only an empty shelf

    The British burned the building, leaving only an empty shelf
  • To cover up the traces of fire, ordered a thie paint on teh gravel, started to be called " White House'' officially.

    To cover up the traces of fire, ordered a thie paint on teh gravel, started to be called " White House'' officially.
  • The spring water into the White House, end of the White House to pull out the history of water

    The spring water into the White House, end of the White House to pull out the history of water
  • The central heating equipment was installed and built second floor bathroom and toilet

    The central heating equipment was installed and built second floor bathroom and toilet
  • Established the library

    Established the library
  • First elevator used in the White House

    First elevator used in the White House
  • Western wing was expanded to build the famous Oval Office

    Western wing was expanded to build the famous Oval Office
  • Rose garden for the first time to grow roses

    Rose garden for the first time to grow roses
  • Construction of the third floor

    Construction of the third floor
  • The west wing was renewed again

    The west wing was renewed again
  • Added a balcony at the southern colonnade

    Added a balcony at the southern colonnade
  • Installed a fire alarm system

    Installed a fire alarm system
  • Cancel the implementation visitors could take pictures

    Cancel the implementation visitors could take pictures