Production Schedule

  • Pitch

    We will present our pitch to the class during our lesson on the Monday morning.
  • Period: to

    Production Schedule

  • Pick up equipment

    We will start filming during the half term so we have booked to borrow the equipment during the first slot of the half term.
    Tia and Jessica will pick up the the equipment on the friday afternoon after their lesson.
  • Filming

    Filming
    We will all meet up at 11am at Kings Cross station and make our way to Greenwich, where the Emirates cable cars are located. After we finished filming at the cable cars we will make our way to Greenwich pier.
    We will need:
    -Camera (record footage)
    -Camere (to take pictures for ancillary work)
    -Batteries
    -Figrig Both Jessica and Tia are required. They will need to be in their casual outfits. And they will need their phones as props.
  • Filming

    Filming
    We will start filming at Alexandra Park and the go to Shoreditch. Both Jessica and Tia are required. They will need to be in their 2nd casual urban outfits. We will need:
    -Camera (record footage)
    -Camere (to take pictures for ancillary work)
    -Batteries
    -Figrig The props that we will need is the red smoke bombs and sparklers.
  • Return equipment

    We will need to return the equipment on Wednesday during mid-day.
  • Filming

    During our Monday morning lesson we will be filming in the studio room with the white background. Tia will be required for the filming. She will need to be dressed in in her formal casual costume. We will need:
    -Camera (record footage)
    -Camere (to take pictures for ancillary work)
    -Batteries
    -Figrig
  • Review footage

    We will review our footage during our Thursday lesson and see if there is the need for re-shooting.
  • Filming

    If more footage is reqired we will go out and film more footage.
  • Re-shooting

    If re-shooting is required we will go out and film as there is no college on this day.
  • Filming Deadline