In 1855 there was over 5500 tonnes of iron and steel imported.
-
Another 7500 tonnes of iron and steel were imported.
-
Smelting of Iron and Steel was attempted near Mittagong, NSW. This was the first attempt in Australia.
-
Scott Clow and Prebble the first cast-iron foundry in Melbourne.
-
The smelting of iron was attempted again by the Vicotria Iron Company.
-
The Victoria Iron Company became the Lal Lal Iron Mining Co. Ltd.
-
A small blast furnace was constructed and operated in the 1880's. An empolyee was sent to Britain to learn how to operate the new technology, it took 5 before satisfactory production was achieved.
-
The plant was shut down due to the fact is was not economical.