Airplane 14-Bis
IT'S A PROJECT BECAUSE:
- Unique: World's first invented aircraft that took off on its own without needing any outside help.
- Planned: Because Santos-Dumond took some time to study about the project before built it and put it to fly, and did some tests to make sure that was working.
- Temporary: Because had a start and an end when the project was successful with its flight.
- Defined deliverable: The airplane 14-Bis.
PRIORITY MATRIX:
Quality = Fixed
Time = Optimized
Cost = Accepted -
Santos Dumond Airport in Rio de Janeiro/RJ, Brazil
IT'S A PROJECT BECAUSE:
- Unique: Because it was the first civil airport built in Brazil.
- Planned: Because they had to study the land first before they started building the airport. In addition, many people worked on this project and it took years to finish.
- Temporary: Because it had a date to begin (1934) and a final date (1936).
- Defined deliverable: The Santos Dumond Airport.
PRIORITY MATRIX:
Quality = Fixed
Time = Optimized
Cost = Accepted -
First airport in London
IT'S A PROJECT BECAUSE:
- Planned: Richard Fairey planned to assemble and test the aircraft.
- Temporary: In 1930 with testing and assembling aircraft and ended by delivering airport to the Air force.
- Unique: First airport in London.
- Defined Deliverable: Airport for the aircraft.
PRIORITY MATRIX:
Quality=Fixed
Time=Optimise
Cost=Accept -
H225M Cougar Medium Multi Mission Helicopter - is a helicopter developed by Eurocopter that is used for both military and civil purposes. The helicopter is used for many different missions including combat search and rescue and medical missions
IT'S A PROJECT BECAUSE
- Unique: because it is the first helicopter developed of its kind.
- Planned: because it has a start date 1999 and finish date 2005 which makes it temporary.
- Defined deliverable: is the finished helicopter.
PRIORITY MATRIX:
- Time = Optmize
- Cost = Accept
- Quality = Fix -
1. Re - Construction of air traffic management tower at Heathrow airport
IT IS A PROJECT BECAUSE:
- Planned: the tower with an unobstructed view cost 50 million and the height was 87m.
- Temporary: The tower was completed in the last quarter of 2007.
- Unique: an obstructed view tower with 360 degrees
- Define Deliverable: ATM tower
PRIORITY MATRIX:
Quality=Fixed
Cost=Optimise
Time=Accept -
2. MQ – 9 Reaper drone
IT IS A PROJECT BECAUSE:
- Planned: Needed high technology and huge cost involved.
- Temporary: The project started after its first maiden flight and finished in 2007.
- Unique: There is a difference between size, engine, etc from other drones.
- Define Deliverables: Drone for the US army.
PRIORITY MATRIX:
Quality=Fixed
Cost=Optimise
Time=Accept -
Boeing 737 AEW&C Wedgetail Early Warning Aircraft - Top hat feature that allows air control from the sky
IT'S A PROJECT BECAUSE:
- Unique: The top hat feature is the first of its kind on a 737
- Planned: Because it started in 2002 and the first plane delivered was 2009 which makes it temporary
- Defined deliverable: completed plane with top hat feature and early warning and control systems
PRIORITY MATRIX:
Time =Accepted
Cost = Optimize
Quality = Fix -
Airplane KC-390
IT'S A PROJECT BECAUSE:
- Unique: Because it’s Brazil's first military transport plane.
- Planned: Because was 7 years of study in partnership with Argentina, Portugal and Czech Republic just to develop the prototype of the KC-390 airplane.
- Temporary: Because it had a initial date (2009) and an end date (expected to be finalized at the first semester of 2019).
- Defined deliverable: The airplane KC-390.
PRIORITY MATRIX:
Quality = Fixed
Cost = Optimized
Time = Accepted -
Hangar Complex Cloudnine At Camarillo Airport, United States.
IT'S A PROJECT BECAUSE IT IS:
- Unique: The first design of its kind.
- Planned: RKR, Inc. and Centrex collaborate to build the first CloudNine, a private hangar complex.
- Temporary: Will last for the duration of the construction.
- Defined deliverable: Four private hangars of 25,000 square feet, each with up to 5,000 of attached Class A offices & feature luxury amenities designed for the private hangar owner in mind. PRIORITY MATRIX:
Cost = Accept
Quality = Fixed
Time = Optimised -
PD-1 VTOL Fixed-Wing Unmanned Aerial System (UAS) is a programmable unmanned drone that can carry up to 7kg
IT'S A PROJECT BECAUSE
- Unique: Because it is the first drone to be capable of so much
- Planned: This project started in 2018 and is expected to be completed by 2020 which makes to temporary.
- Defined deliverable: PD-1 VTOL Fixed-Wing Unmanned Aerial System
PRIORITY MATRIX:
- Time = Optmize
- Cost = Accept
- Quality = Fix -
Airlander 10 Electric Propulsion System
IT'S A PROJECT BECAUSE:
- Unique: First time a “hybrid” airship lifted both by the buoyancy of helium and aerodynamic thrust is designed.
- Planned: Collins Aerospace, Hybrid Air Vehicles & UK’s University of Nottingham are investing and developing the prototype.
- Temporary: will only last the project duration.
- Defined deliverable: Develop a 500kW (650hp) electric propulsion system for the Airlander 10 airship
PRIORITY MATRIX:
Cost = Fixed
Quality = Optimised
Time = Accept -
Rolls-Royce Ultrafan engines for Airbus A350neo Series
IT'S A PROJECT BECAUSE:
- Unique: Biggest aviation-architectural shift since the three-spool RB211’s was introduced to the aviation spotlight in the 1960s.
- Planned: Airbus & Rolls-Royce are collaborating to unveil this series of new twin engines.
- Temporary: Planning will only occur once.
- Defined deliverable: First multi-generational upgrade of Airbus’ mostly carbon fibre twin-aisle.
PRIORITY MATRIX:
Time = Fixed
Quality = Optimized
Cost = Accept