Staubli Building Expansion

  • Bulldozers Arrive

    Bulldozers Arrive
  • Air Conditioners Removed

    Air Conditioners Removed
    Cranes lift out the air-conditioning units in perperation of the site for digging.
  • Trees Removed

    Trees Removed
    Trees are removed from the parking lot, along with the light posts and guard rail.
  • Groundbreaking Ceremony

    Groundbreaking Ceremony
    Staubli Corporation CFO Roger Varin, Staubli Corporation CEO Yves Staubli, Staubli Group CEO Rolf Strebel, and Multi-Contact CEO Franco Delvecchio break ground for the expansion.
  • Digging Begins

    Digging Begins
    Digging begins at the Staubli site, preparing the ground for the foundation of the expansion's infratructure.
  • Digging Continues

    Digging Continues
    Bulldozers continue to prepare the ground over Staubli's 15.6 acre site.
  • Digging Update

    Digging Update
    The land around Staubli Corporation already looks completely different.
  • Robotics Parking Lot is Demolished

    Robotics Parking Lot is Demolished
    The parking lot was broken into small pieces, and the rubble is to be used as part of the foundation when the valley behind Staubli is filled with the soil from the hill to its side.
  • Parking Lot Demolition is Complete

    Parking Lot Demolition is Complete
    The bulldozers have scooped up the rubble after the parking lot is broken up.
  • Valley Begins to be Filled

    Valley Begins to be Filled
    The hill where the truck on the right sits used to be a valley, but now is filled with dirt from the hill beside Staubli.
  • Driveway Construction

    Driveway Construction
    Bulldozers begin spreading gravel over the area that will eventually become the driveway to the new parking lot
  • Foundation Construction Beginning

    Foundation Construction Beginning
    The old robotics parking lot was ground up and spread along the expansion area
  • Solar Panels Installed

    Solar Panels Installed
    Two Solar Panels are installed, which utilize the same type of solar components that Staubli Corp will manufacture after the building expansion is complete.
  • Gravel spread

    Gravel spread
    Gravel is spread in the area behind the current buliding, in preparation for the cement to be poured.
  • Parking lot grading

    Parking lot grading
    The ground is prepared for the new parking lot to be paved.
  • Parking lot nears completion

    Parking lot nears completion
    The new parking lot takes shape.
  • First steel beams erected

    First steel beams erected
  • More steel beams

    More steel beams
    After months of preparing the foundation, the new buidling structire begins to take form.
  • Support beams for roof installed

    Support beams for roof installed
    The new structure begins to take shape
  • Steel beam progress

    Steel beam progress
    The beams have been erected around the entire perimeter of the expansion.
  • Steel beam progress

    Steel beam progress
  • Steel Beam Progress

    Steel Beam Progress
  • New Parking Lot is Paved

    New Parking Lot is Paved
  • Concrete walls installed

    Concrete walls installed
    A giant crane lowers in the concrete slabs which will be the walls of the addition.
  • More concrete walls go up

    More concrete walls go up
  • More walls go up

    More walls go up
  • More walls go up

    More walls go up
    Almost all the walls are up now. After they are all installed, the concrete floor will be poured.
  • More walls go up

    More walls go up
    The crane drops in one of the final concrete slabs.
  • Walls continue to go up

    Walls continue to go up
  • Last walls in place

    Last walls in place
  • Pipes installed

    Pipes installed
    Some pvc pipes are installed in trenches dug in the ground
  • Electrical work done

    Electrical work done
    These metal boxes housing electical circuits were installed today
  • Cement trucks arrive

    Cement trucks arrive
  • Pouring of concrete floor begins

    Pouring of concrete floor begins
  • Concrete pouring continues

    Concrete pouring continues
    after some wet weather delays
  • More concrete poured

    More concrete poured
  • Workers smooth out the wet concrete

    Workers smooth out the wet concrete
  • Concrete continues

    Concrete continues
    Workers drive small vehicles with brushes on the bottom over the concrete as it hardens, buffing and smoothing out the surface.
  • Building progress

    Building progress
    Here is the latest exterior shot of the expansion
  • Paint Test

    Paint Test
    A wall was painted with different shades of gray to determine what color the exterior of the building should be painted. The shade on the far left was chosen.
  • Floor & ceiling progress

    Floor & ceiling progress
    The floor is over half complete, and the Insulation for the ceiling has begun to be installed.
  • Ceiling Progress

    Ceiling Progress
    A worker in the background is lifted up on a platform as he continues to install ceiling insulation.
  • Floor complete

    Floor complete
    The cement floor has dried and been buffed out to a shiny finish.
  • More framework goes up

    More framework goes up
  • Interior cement brick wall built

    Interior cement brick wall built
  • Interior progress

    Interior progress
    You can see where the old building ends, and the new structure begins.
  • Interior wall framework goes up

    Interior wall framework goes up
    Rooms begin to be mapped out while the roof continues to be built.
  • Interior progress update

    Interior progress update
    You can see the metal framework for the walls in the background.
  • Wall framework complete

    Wall framework complete
  • Wiring installed

    Wiring installed
  • Windows installed

    Windows installed
  • Transformer installed

    Transformer installed
  • Building exterior painted

    Building exterior painted
  • Windows masked off in preparation for painting

    Windows masked off in preparation for painting
  • Another shot of the newly painted exterior

    Another shot of the newly painted exterior
  • Ceiling painted white

    Ceiling painted white
  • Interior walls painted white

    Interior walls painted white
  • More exterior painting

    More exterior painting
  • Drywall hanging begins

    Drywall hanging begins
  • Drywall hanging continues

    Drywall hanging continues
  • Interior lights hooked up

    Interior lights hooked up
  • Stripe painted around building

    Stripe painted around building
  • Interior walls painted

    Interior walls painted
  • Walls knocked down

    Walls knocked down
    Several sections of the former exterior wall of the old building were knocked down to accomodate the new layout.
  • Mezzanine constructed

    Mezzanine constructed
    The mezzanine is above several newly constructed rooms.
  • Mezzanine stairs constructed

    Mezzanine stairs constructed
  • Loading bay doors installed

    Loading bay doors installed
    Two interior doors were installed, separating two large sections of the expansion.
  • Ducts / Sprinklers installed

    Ducts / Sprinklers installed
  • Doors & exit signs installed

    Doors & exit signs installed
  • Interior glass installed

    Interior glass installed
  • Exterior loading bay doors installed

    Exterior loading bay doors installed
  • New entrance sidewalk poured

    New entrance sidewalk poured
  • Drop ceiling framework installed

    Drop ceiling framework installed
  • Additional walls removed

    Additional walls removed
  • Continued Installation

    Continued Installation
    Installation of items such as plug sockets, fire alarms, light switches and entrance security systems continue to get the espansion closer to completion.
  • Ceiling Panels put in

    Ceiling Panels put in
  • Cabinets / counters installed

    Cabinets / counters installed
    These are in the new breakroom.
  • Flooring installed

    Flooring installed
    These are the floors that will not be carpeted, but instead have a dark gray glossy finish.
  • Cabinets / Counters complete

    Cabinets / Counters complete
  • New wall openings get a more finished look

    New wall openings get a more finished look
  • Updated picture of STC front

    Updated picture of STC front
  • Mezzanine and stairs painted

    Mezzanine and stairs painted
    Additonal rooms, including restrooms, are underneath.
  • Updated shot of interior hallway

    Updated shot of interior hallway
  • Plastic cover behind wall openings removed

    Plastic cover behind wall openings removed
    The old and new parts of STC are now connected. You can see the original robotics shop through the cavity.
  • Updated exterior shots

    Updated exterior shots
    As small details continue to be completed on the expansion, here are some updated shots of the new exterior of STC.
  • Updated exterior shots

    Updated exterior shots
  • Updated exterior shots

    Updated exterior shots
  • Warehouse space nears completion

    Warehouse space nears completion
    This is the view from the original part of the building, looking into the expansion.
  • Another breakroom is completed

    Another breakroom is completed
  • Machinery moved into warehouse

    Machinery moved into warehouse
    This machines will be for the assembly of electrical connector components.
  • Furniture moved into robotics training room

    Furniture moved into robotics training room
  • Machines moved into textile training room

    Machines moved into textile training room
  • Updated picture of warehouse

    Updated picture of warehouse
    Floor has been cleaned.
  • Landscaping

    Landscaping
    River rocks are arranged around the building.
  • Moving furniture into new training rooms

    Moving furniture into new training rooms
  • Another classroom set up

    Another classroom set up
  • Awnings installed

    Awnings installed
  • New roadside sign letters installed

    New roadside sign letters installed
  • New logo sign installed on the front of STC

    New logo sign installed on the front of STC
    It now has the new Stäubli logo that was modified in 2007.
  • Stäubli logo installed on sides of building

    Stäubli logo installed on sides of building
  • New logo signs are finished

    New logo signs are finished
    You can see the other new awning as well.
  • New logo sign on the opposite wall

    New logo sign on the opposite wall
  • Steel beams installed

    Steel beams installed
    These steel beams are inside the new warehouse.
  • Steel beams continued

    Steel beams continued
    The beams were added to the infrastructure of the warehouse space.
  • Supplies and other items moved into new warehouse

    Supplies and other items moved into new warehouse
  • STC recarpeted

    STC recarpeted
    New carpet was installed throughout the offices of STC, replacing the old blue carpet shown in the foreground.
  • New entrance plaque installed

    New entrance plaque installed
    The new plaque displays all three Stäubli divisions, as well as Stäubli Group company Multi-contact.
  • Diko and Komax machines set-up

    These machines will assist with the assembly of the Multi-Contact solar connectors.
  • ECS Ribbon cutting ceremony

    ECS Ribbon cutting ceremony
    With the the Diko and Komax machines installed, Yves Stäubli cuts the ribbon and the first Multi-Contact solar couplings are produced.
  • First solar connectors manufactured (continued)

    First solar connectors manufactured (continued)
    Here is an additional image, showing the first Multi-Contact connectors being assembled during yesterday's ceremony.