Production schedule

By ellen17
  • Period: to

    Production Schedule

  • Photoshoot

    Photoshoot
    Studio style photoshoot for S.Dot and a few shots of J (feature artist).
    Costumes and both artists needed
  • Filming Day 1

    Filming Day 1
    Shoreditch
    Performance + Basetrack location!
    S.dot + J needed + costumes for this location.
    No props needed
  • Filming Day 2

    Filming Day 2
    Filming of the monuments including the London Eye.
    Footage needed for the intro of the song to establish location.
    No artist needed.
  • Filming Day 2

    Filming Day 2
    Begin filming at Namco Arcade.
    Location where our artist's have fun and show off their performance skills as well as their relationship.
    S. dot + Jasmine needed and their costume for this location.
    Lighting may be needed for the right lighting for the camera.
    No props needed.
    Not a basetrack location.
  • Filming Day 3

    Filming Day 3
    Incase we need to get new footage from this location. Otherwise we'll spend the day editing or taking new pictures of our artist for his social media.
  • Filming Day 4

    Filming Day 4
    Gainsborough Studios in the day
    Main focus are the artists.
    Second basetrack to be filmed.
    s.dot + Jasmine needed and their costumes for this location.
  • Filming Day 4

    Filming Day 4
    Shoreditch (Day)
    Incase more footage is needed.
  • Filming Day 5

    Filming Day 5
    Westfield Shoping Centre
    S.dot + J needed
    No props needed.
  • Filming Day 6

    Filming Day 6
    Millennium Bridge
    In case more footage is needed.
    Lighting may be needed.
  • Filming Day 7

    Filming Day 7
    Gainsborough Studios
    S.dot and J needed
    No props needed.