NASA Space Probes

  • STS-109

    it was an 11 day mission with a bunch of space walks
  • STS-113

    it was also postponed by 24 hours and other was some troubleshooting
  • STS-116

    the shuttle launch was first delayed because of low cloud cover. on the ISS there were many repairs to be done
  • STS-123

    the purpose of the 25th shuttle to the ISS was the bring a new astronaut and return the one that had been working there
  • STS-126

    it was the 27th shuttle to the ISS and was a supply ship bringing things like repair stuff and exercise equipment
  • STS-119

    it was the 28th shuttle to the ISS led by Lee Archambault where they replaced the crew that went back to earth.
  • STS-128

    it carried life support racks and science racks and launched a light-weight multipurpose support structure from the discovery pay-load
  • The STS-123

    It was the 33rd space shuttle to space and discovered multi-purpose since ranks that were sent to laboratories on the ISS the mission had 3 space walks that repaired the spaceship.