Day 1- Devon S
WHAT- I completed a push button to control a light. Then I used 2 push buttons in order to control the same light. WHO- The single push button I completed by myself and the 2 push button project I completed with Nate as well. -
Day 2- Devon S
WHERE- Traveled in Torrington and Barkhamsted WHAT- Went out to look at production jobs in Torrington and in Barkhamsted. -
Day 3- Devon S
WHERE- We worked in a shop on the big tables to complete the projects that we did today WHAT- We worked on ice cube relays projects 1-4. Mostly containing a switch controlling the ice cube relay -
Day 4- Devon S
WHAT- Wired 2 push buttons to an ice cube relay and to a light. We then made one of the push buttons a maintaining push button. WHERE- We worked on the big tables at our desks. -
Day 5- Devon S
WHAT- This morning we read about unit 3 and unit 4 of Mike Holt then took a post test on it. We then watched a Mike Holt video going more in depth about unit 3 and unit 4. WHERE- We completed unit 3 and unit 4 in the other room. Then completed the post test and watched the video in the main room. -
Day 6- Devon S
WHAT- We went to the other room to read and watch units 5 and 6 of Mike Holt. Afterwards we went back to the main room and learned about motor starters and we wired them. WHO- I worked on Mike Holt with Nate and we both wired the project together. -
Day 7- Devon S
WHAT- We wired a motor starter with an emergency stop added to it
WHERe- In shop on the work tables -
Day 8- Devon S
WHAT- we completed the project from day 7
WHERE- we finished them up at the work benches -
Day- 9 Devon S
WHERE- Mazzones room
WHAT- We completed units 8 and 9 of Mike Holt in which we learned about over current protection as well as Indicator Lights.