-
Period: to
Approximatly 5500 tons of Iron and Steel are imported and a further 7500 by the end of 1840.
-
Peter Russell took over the Sydney foundry and engineering works
-
first attempt at establishing smelting of iron and steel near Mittagong, NSW
-
Institute of engineering foundered
-
second attempt at estiblishing iron and steel smelting in Victoria
-
Victorian iron companay became Lal Lal mining Co.Ltd
-
Period: to
Small blast furnace was built but in 1880 stoped operating
-
Smmelting plant near Mittagong,NSW closed