Construction of the Golden Gate Bridge took a total of 1,604 days or a little over 4 years and 4 1/2 months.
-
Thousands of people were doing a variety of things such as riding bikes, there was a live band, and even a circus act that performed on the bridge itself. It was a chaotic event that never happened again due to people fainting.
-
300,000 San Franciscans walked the Golden Gate Bridge with a live band, circus acts, people riding bikes, and even on roller skates to celebrate the 50th Anniversary of the Golden Gate Bridge.
-
: The statement associated with the Crisis Counseling/Motorist Call Boxes on the Bridge sidewalks was modified to include: “There is hope, Make the Call. The consequences of jumping from this Bridge are fatal and tragic.” This message wanted to reach others that there is always another way out.
-
The massive grant for this project was issued on Dec. 29, 2022, by the Department of Transportation’s Bridge Investment Program. This was granted by Joe Biden who made this decision in late 2021.